β˜… Local Leeds roofing specialistsβ˜… All LS postcodesβ˜… 24/7 callouts
πŸ“ž 07749 941 111
Home › FAQs
Frequently asked

Common roofer questions

Real answers to the questions we get every week. If yours is not here, just ring us.

How fast can you assess the damage?
Same-day quote in most LS postcodes. We send drone photos so you can see what we see. Related: Roof Repair
Do you scaffold for small repairs?
Single-storey we use a long ladder with anchor. Anything above we scaffold, safer and faster. Related: Roof Repair
Which is better, EPDM or GRP?
EPDM is faster to fit, more forgiving in cold weather, 20-year warranty. GRP is harder-wearing but more skilled to install. We recommend per job. Related: Flat Roof Replacement
How long does install take?
1–3 days for most flat roofs. EPDM is one continuous sheet for most rear extensions. Related: Flat Roof Replacement
Welsh, Spanish or reclaimed?
Welsh is best quality but expensive. Spanish is the standard mid-grade. Reclaimed is good for period properties, we source from local salvage yards. Related: Slate Roof Repair & Replacement
How long does a full re-slate take?
5–10 days for a 3-bed semi. Scaffolding goes up first, work runs in stages. Related: Slate Roof Repair & Replacement
Can you match old tile profiles?
Usually yes, we keep Marley, Redland, Sandtoft in stock and can source reclaimed for older patterns. Related: Tile Replacement
How long does a full re-roof take?
7–14 days depending on size. Scaffolding day 1, strip day 2, batten/felt days 3–5, tile days 6+. Related: Tile Replacement
How do I know if I need a rebuild vs repoint?
Rebuild if pointing has gone soft throughout and bricks are sliding. Repoint if just the mortar is failing. Related: Chimney Repair & Repointing
Lead apron, how long does it last?
Code 4/5 lead lasts 60+ years if installed properly. We use traditional lapped joints. Related: Chimney Repair & Repointing
How do you clean, pole or ladder?
Both, gutter vac for clearance, hand-finish where needed. Camera evidence supplied. Related: Gutter Cleaning & Replacement
When should I replace vs repair?
Replace if more than 30% of the run is corroded, sagging or split. Repair otherwise. Related: Gutter Cleaning & Replacement
What’s in the report?
High-res drone photos of every elevation, prioritised list of any issues, indicative repair costs, suitable for insurance. Related: Roof Inspection & Survey
Will the report be accepted by my insurer?
Yes, we use the standard claims-ready format. Related: Roof Inspection & Survey
How long does install take?
1 day on the roof, half a day for plastering and decorating returns. Related: Velux & Roof Window Installation
Will I lose use of the room?
Yes for the day of install, dust sheets used, debris cleared. Related: Velux & Roof Window Installation

Question we did not answer?

Ring us and ask. Real person, in Leeds, on the other end.

Call 07749 941 111  Request a callback
πŸ“ž Call 07749 941 111